The Engineering Audit
We audit your facility's energy physics, run the vendor math, and present a Board-ready business case. Our advisory is covered by the vendor you select. You invest nothing upfront.
"I announced Net Zero by 2030. My operations team says the grid can't support it. My Board wants margin protection. I need someone who can give me the math — not another consulting deck."
— Every Corporate Architect We Talk To
The Zero-Cost Engineering Audit
We deconstruct your CFE bills, interval data, and demand peaks by tariff block (GDMTH/GDMTO). We identify the hours that drive 80% of your cost and the loads that are genuinely shiftable. Most facilities discover 15–25% of their bill is structurally reducible before a single panel is installed.
What it costs you
Our advisory fee is covered by the energy provider you select. You keep the full audit — at no cost — regardless of the outcome.
Book Your Free AssessmentWhatsApp PBDTimeline
We See the Grid From the Inside
As advisors to the Agencia de Energía del Estado de Jalisco, we have ground-level visibility into Mexico's energy regulatory apparatus. This is not desktop research.
Grid Node Intelligence
We track congestion data across Mexico's transmission network before CENACE publishes. We know which interconnection points are viable for your project.
Permit Tracking
We monitor every generation permit moving through CNE — which are advancing, which are stalled, and why. Real-time regulatory intelligence.
DACG Compliance
The October 2025 DACG rules now mandate BESS integration for every new generation project. We wrote analysis on these rules before most consultants read them.
Pipeline Visibility
We monitor the 20 renewable projects worth $2B that SEDES is advancing in Jalisco — and how they affect your interconnection options and competitive landscape.
We Map the Capital — So You Don't Leave Money on the Table
Mexico's green financing ecosystem is deep but fragmented. PBD connects your energy project to the right capital structure — from federal development banks to private EaaS providers.
Nafin & Bancomext
Green credit lines, ESG-tagged bonds, MIPYME guarantees up to 70%. Plan México: $120,000 MDP in total guarantees.
NAFIN · BANCOMEXT · BANOBRAS · FIDE
PROJAL & State Agencies
Preferential credit for Jalisco enterprises. AEEJ-Plus Corp alliance: $750 MDP earmarked for industrial renewables.
PROJAL · AEEJ · FONDESO · State Energy Agencies
Green Project Finance
Multiva's $170B MXN green pipeline. Sustainability-linked loans with ESG KPI rate reductions. Solar+BESS syndication.
MULTIVA · BBVA · HSBC · BANORTE · AFIRME
Asset Financing
100% OPEX-deductible equipment leasing. Solar, BESS, and EV fleet financing with the asset as collateral.
ENGEN · TIP · PLUS CORP · SERFIMEX · FINBE
Zero-CAPEX Deployment
On-site solar, BESS, and microgrids with zero upfront investment. Discounts of 10–45% vs. CFE tariffs.
SKYSENSE · ENERGÍA REAL · KAM · BRIGHT · QUARTUX
Concessional Capital
Long-term debt at below-market rates from multilateral development banks. Blended finance with grant components.
KfW · BID · IFC · GCF · NADBank · AFD · JBIC
Fiscal Optimization
PODECIBI immediate deduction for green assets 2025–2030. Accelerated depreciation, FIDE subsidies (25% grant for solar).
SAT · CONUEE · FIDE-SENER · SHCP
FIBRA-E & Green Bonds
Infrastructure trusts and sustainable bond frameworks for large-scale portfolios and institutional investors.
BMV · MONEX · BANCO SABADELL · BANCOMEXT
Don't know which financing structure fits your project?
That's literally what we do.
Book a ConsultationOngoing Advisory
Once we've executed your energy procurement, many clients retain PBD for continued strategic intelligence.
Monthly USMCA and Mexico regulatory intelligence. Advisory calls. Compliance monitoring. You know what's coming before it arrives.
See a sample advisory brief →Full energy procurement strategy. Vendor management. CNE and CENACE permitting support. Board-ready quarterly reporting.
Discuss ongoing support →Fixed-fee technical and regulatory due diligence on specific energy infrastructure projects. IRR validation. Risk scoring.
Scope a diligence engagement →